Tag: Model Fixing Operation

  • Model Fixing Operation

    by

    Model Fixing Operation After a one month blockage at the customs, two days ago we received the physical model of the airport. Due to the extreme temperature, the petroleum based parts of the model lose their flexibility and bumped to the limit. Some of them indeed was fractured, if you’re lucky you can spot them from the photos. Now i…

    Continue reading »